
Thursday, November 23, 2023
In today’s blog I’m highlighting the benefits to you and community with the use of Global Encasement, Inc’s Award Winning Green Coatings Encasement, especially when it comes to historic properties.

Listen and Learn: Dive into the Audio Version of Our Blog
In today’s blog I’m highlighting the benefits to you and community with the use of Global Encasement, Inc’s Award Winning Green Coatings Encasement, especially when it comes to historic properties.
In the heart of Nyack, New York, stands a historical treasure on the verge of both revival and ruin – The Nyack Center. This 1839 Greek Revival style former Presbyterian Church, now a multi-use community facility, faced a perilous challenge: ridding itself of hazardous lead-based paint without sacrificing its fragile historic charm.
The story of its transformation is not just a testament to architectural ingenuity but a triumph of preservation against the odds.
The Challenge:
Unveiling the Hidden Threats
Nyack officials grappled with a dual challenge when it came to restoring The Nyack Center.
Beyond the daunting task of lead-based paint abatement, the delicate historic architectural details posed a formidable hurdle.
The fear loomed that traditional removal methods like chemical stripping, excessive scraping or sandblasting could irreversibly harm the building's fragile features.
Also generating toxic solid hazardous waste that would need to be transported and stored causing the overall project cost to skyrocket.
Facility Challenge:
A Delicate Dance with Time
Built in 1839, The Nyack Center's proximity to the street added another layer of complexity.
The exterior surfaces, clad in badly delaminated lead-based paint, left the building vulnerable to weatherization and water damage.
A mere foot from the street, the structure presented a containment challenge during abatement, demanding a solution that not only removed the threat but enhanced its historical significance.
Benefits Desired:
A Vision of Preservation
The vision for The Nyack Center's restoration extended beyond mere abatement.
Officials sought a solution that aligned with modern environmental standards while offering a 20-year warranty, preservation of historic architectural details, non-toxic and VOC-free properties, and a reduction in hazardous waste generation.
The stakes were high, and the expectations even higher.
Results:
A Renaissance in Preservation
Enter Win Perry of Schofield Colgan Perry & Lawler Architects, armed with a commitment to excellence and a solution that surpassed expectations.
GEI (Global Encasement, Inc’s) award-winning products became the linchpin in the Nyack Center's exterior renovation.
The tailored GEI Global Encasement System of Green Coatings Encasement, featuring PrepLESS Primer, GEI Globe Caulk, and LeadLock TopCoat, not only abated the lead-based paint issue but surpassed all expectations.
Preservation Beyond Expectations:
The Global Encasement Advantage
The success lay in more than just containment. The system minimized surface preparation, sealed, waterproofed, and protected surfaces without trapping moisture.
It bridged cracks seamlessly, earned a Class A Fire Rating, and was effortlessly applied.
The Nyack Center not only regained its lost glory but emerged stronger, more resilient, and ready to face the future.
Conclusion:
A Legacy Restored, a Future Secured
The Nyack Center's journey is more than a case history; it's a testament to the transformative power of innovative solutions and unwavering dedication to preservation.
Global Encasement, Inc not only met the challenge but exceeded expectations, leaving Nyack with a piece of living history—a beautifully preserved architectural gem standing proudly in the face of time.
Here are the highlights:
• 🏛️ The Nyack Center, a 1839 Greek Revival gem, faced lead-based paint hazards threatening its historic charm.
• 🚧 Officials grappled with the challenge of abatement without harming fragile architectural details.
• 🌿 Desired: Green solution, 20-year warranty, historic preservation, non-toxic, and reduced waste.
• ✨ Global Encasement's system, chosen by Win Perry, exceeded expectations with PrepLESS Primer, GEI Globe Caulk, and LeadLock TopCoat.
• 💪 Results: Minimal surface prep, waterproofing without trapping moisture, crack bridging, and a Class A Fire Rating.
• 🌟 The Nyack Center emerges stronger, preserved, and ready to face the future.
“Often when you think you’re at the end of something, you’re at the beginning of something else.” ~ Fred Rogers

Tuesday, August 20, 2019
I’ve been having many discussions about the recent wildfires in California and how they pose environmental concerns after the initial threat has passed. The fallout from wildfires is immediate although much of the trouble continues when clean up starts. The cleanup can cause a whole set of concerns that can be dealt with using some simple solutions.

Thursday, August 01, 2019

Wednesday, June 26, 2019
I’ve been camped out at the local hotel in Stilwell Oklahoma for the last few weeks. I was originally here to educate the Cherokee Tribe on how to safely in place manage the lead-based paint and asbestos in their buildings and housing. Also how to fortify their properties against heavy weather events and restore roofing. Things expanded from there as I came in just as the area was being hit with strong and disruptive weather.

Tuesday, May 28, 2019
Have you ever heard of Tornado cough?

Saturday, May 18, 2019
Mavis is a personal friend of mine and I’m always so impressed with the important work she, her team and foundation are doing. She is so passionate about helping others and getting information out to educate all about exposure to asbestos and associated illnesses.
